Guatay MBC Consolidation Feasibility Factsheet Documents
On May 21, 2003, on motion of Supervisor Jacob, and seconded by Supervisor Horn, the County of San Diego Board of Supervisors unanimously directed the Chief Administrative Officer to conduct a comprehensive groundwater study for the Pine Valley area. This directive was part of confirmation of direction for staff’s activities being conducted on the General
Rough Acres Water Sale Cancelled
As the water company indicated in early 2015, the planned sale of water to Rough Acres Water Company was cancelled due to the decision of Soitec to not pursue their solar project. In February 2016, Rough Acres also notified PVMWC of their decision to cancel the mutual aid agreement with Pine Valley due to changing
PVR Improvements
The Company recently completed improvement work for the water system that supplies the Pine Valley Rancheros Subdivision. Phase 1 of the work included the replacement of curb stop control valves at each meter as well as customer gate valves and meters where needed. In addition each meter box was replaced and the 8″ main line
#5 Well Structure Upgrade
We recently rebuilt #5 well house, It was originally a wooden structure. We have replaced it with a longer lasting block structure. Below are some pictures from this project. If you have any questions please feel free to call or e-mail.
#4 Tank Improvements
In January of 2010 Company personnel inspected the interior of the 1/2 million gallon tank off of Old Highway 80. As a result, coating repairs were made through the use of spot sand blasting and epoxy patch coating. The Company strives to do as much work as possible in-house thereby reducing the cost to it’s