Recent Projects

PVR Improvements

The Company recently completed improvement work for the water system that supplies the Pine Valley Rancheros Subdivision. Phase 1 of the work included the replacement of curb stop control valves at each meter as well as customer gate valves and meters where needed. In addition each meter box was replaced and the 8″ main line

Read More

#4 Tank Improvements

In January of 2010 Company personnel inspected the interior of the 1/2 million gallon tank off of Old Highway 80. As a result, coating repairs were made through the use of spot sand blasting and epoxy patch coating. The Company strives to do as much work as possible in-house thereby reducing the cost to it’s

Read More

A-Frame Replacement Project

We recently replaced a 150′ section of 6″ steel pipe which spans Pine Creek Canyon. The original structure was constructed in 1960. The pipeline transfers water from three of our meadow wells to the rest of the Meadow Well Field and then on to our Distribution System. The new pipe has an internal epoxy coating

Read More

1 2