The Company recently completed improvement work for the water system that supplies the Pine Valley Rancheros Subdivision. Phase 1 of the work included the replacement of curb stop control valves at each meter as well as customer gate valves and meters where needed. In addition each meter box was replaced and the 8″ main line valves on Rocky Pass were replaced. After the replacement work was completed, each meter box, valve cap, and hydrant was repainted. Phase II included the rebuild of the PVR pump station’s #2 pump motor. Phase II concluded with the refurbish of the underground pump station’s interior piping. Phase III addressed the draining, inspection, and minor repairs to the interior coating of the 1/2 million gallon thank that feeds the subdivisions. The project concluded with the cleaning, disinfection, refilling and return of the tank to full service. The work conducted for the 3 phases of this project was completely paid for with funds collected as part of the Repair and Replacement Charge that is collected through our bi-monthly billing. No debt was incurred as a result.