A-Frame Replacement Project

We recently replaced a 150′ section of 6″ steel pipe which spans Pine Creek Canyon. The original structure was constructed in 1960. The pipeline transfers water from three of our meadow wells to the rest of the Meadow Well Field and then on to our Distribution System. The new pipe has an internal epoxy coating to ensure its longevity and strength. Company personnel participated in the project, along with our contractor, Hidden Valley Pump Systems Inc., in an effort to keep the cost of the project as low as possible. Below are some pictures of the job as it was in progress.